In April 2026, Changzhou Huiya Decoration Materials Co., Ltd. successfully completed the raised access floor installation project at the satellite office of Japan’s Tokyo Electron Limited (TEL), located in the Runsheng Building, Tongzhou District, Beijing. The project adopted HUIYA GRC800 Raised Access Floor with a total installation area of 725 m², paired with Japanese KONISHI KU928C-X pedestal adhesive. Work began on April 7, 2026, and the project was efficiently delivered within just 9 days.
Project Overview
- Project Name: TEL Satellite Office – Beijing Runsheng Building GRC800 Raised Access Floor Installation Project
- Project Location: No. 15 Huanke Middle Road, Majuqiao Town, Tongzhou District, Beijing
- Installation Area: 725 m²
- Installation Period: April 7-15, 2026
- Product Used: HUIYA GRC800 Raised Access Floor
- Supporting Material: KONISHI KU928C-X Pedestal Adhesive
Project Partner – Serving the Global Semiconductor Giant TEL (Tokyo Electron)
This project involved the raised access floor installation for the Beijing satellite office of Tokyo Electron Limited (TEL), also referred to as “Tokyo Denshi Electronics,” located in the Runsheng Building, Beijing. As a long-term, stable raised access floor supplier for Tokyo Electron in China, Changzhou Huiya Decoration Materials Co., Ltd. once again provided GRC800 raised access flooring products and professional installation services that meet international quality standards.


▲ Exterior view of the Beijing Runsheng Building – a modern industrial office park where TEL’s satellite office is located.
TEL, officially known as Tokyo Electron Limited, is one of the world’s top five semiconductor equipment manufacturers and one of the largest companies by market capitalization in the Nikkei 225 Index. It holds a pivotal position in the global semiconductor supply chain.
TEL’s product portfolio is extremely comprehensive, making it a true “all-rounder” in semiconductor equipment:
- Coater/Developer segment: TEL is the undisputed global leader, commanding approximately 99% of industry profits;
- Etching equipment: TEL shares the market in a three-way split with Applied Materials (AMAT) and Lam Research;
- Cleaning equipment: Expanded its footprint through the acquisition of U.S.-based FSi’s business;
- CVD deposition, thermal processing, and testing equipment: Covering the full range from FAB (wafer fabrication) to LCD panel manufacturing.
As a world-class high-tech enterprise, TEL upholds equally rigorous standards for its office environments and construction quality. Serving such a demanding semiconductor industry client means extremely strict requirements on product quality, installation craftsmanship, and environmental cleanliness.
Huiya & Tokyo Electron – A Long-Term Strategic Partnership
Changzhou Huiya Decoration Materials Co., Ltd. is a long-term stable raised access floor supplier for Tokyo Electron (TEL) in China. Over the years, Huiya has consistently provided raised access floor solutions for multiple TEL projects in China, backed by superior product quality, a stringent quality control system, and professional installation services.
Huiya’s GRC800 product meets the following standards simultaneously:
- 🇨🇳 China GB 36340-2018 – General Specification for Anti-Static Raised Access Floors 🇯🇵 Japan JIS A 1450-2018 – Free Access Floor Test Methods (フリーアクセスフロア試験方法)
Huiya is one of the few domestic raised access floor manufacturers certified under JIS A 1450-2018. Our products have been tested and certified by Japan’s authoritative Central Testing Laboratory, with all performance indicators meeting Japanese export standards.

HUIYA GRC800 Raised Access Floor – Japanese Export-Grade Quality
HUIYA GRC800 is a Glass-fiber Reinforced Cement (GRC) raised access floor product developed by Huiya for high-end office spaces and semiconductor cleanroom environments. It is specifically engineered and manufactured for Japanese-invested and foreign-invested enterprises with the highest quality requirements.

Product Specifications:
| Item | Parameter |
|---|---|
| Model | HUIYA GRC800 |
| Material | GRC (Glass-fiber Reinforced Cement) |
| Dimensions | 500mm × 500mm |
| Unit Height | 100mm |
| Concentrated Load | ≥ 3000N |
| Uniform Load | ≥ 12,500 N/m² |
| Fire Rating | Class A, non-combustible, highest safety grade |
| Anti-Static | Stable and reliable system resistance, effectively protecting precision equipment |
| Environmental | Asbestos-free, formaldehyde-free, compliant with green building requirements |
| Standards | GB 36340-2018 / JIS A 1450-2018 |
| Applications | High-end offices, semiconductor factories, data centers, cleanrooms |
The GRC800 raised access floor, composed of premium glass fiber and a cement-based matrix, offers outstanding advantages including high strength, high durability, fire resistance, and environmental safety. It is particularly suitable for spaces with stringent requirements on indoor environmental quality and floor load-bearing performance.
On-site Installation Record
1. Pre-Construction – Site Survey and Preparation
Before construction, the Huiya engineering team conducted a thorough site survey and assessment. The office area was delivered as a bare shell; the concrete floor was well-leveled, ceiling height was ample, and ceiling-mounted MEP pipelines were largely in place – all conditions were ready for raised access floor installation.

The engineering team also performed precise measurements and layout planning, marking elevation differences across each zone according to the architectural floor plan to ensure that the overall flatness after installation would meet the Japanese client’s acceptance standards.

2. Panel Preparation – Strict Quality Control to Japanese Export Standards
All GRC800 raised access floor panels used in this project were manufactured at Huiya’s Changzhou factory and underwent a rigorous quality inspection process before leaving the factory, ensuring that each panel’s dimensional accuracy, surface quality, and load-bearing performance met Japanese export standards.
场外办公室-北京润生大厦725㎡汇亚GRC800架空地板安装项目-1.jpg)

Each batch is accompanied by complete quality inspection records and certificates of conformity, ensuring full traceability of quality from factory to site.
3. Installation Process
Pedestal Installation and Panel Laying
The installation team strictly followed Huiya’s standardized construction procedures. First, height-adjustable metal pedestals were precisely positioned and installed on the concrete substrate, with each pedestal calibrated one by one using a laser level to ensure the horizontal precision of the entire raised access floor system.

Pedestal Bonding – KONISHI KU928C-X Adhesive
This project used Japan’s KONISHI KU928C-X pedestal adhesive to firmly bond the metal pedestal bases to the concrete substrate, further enhancing the overall stability of the raised access floor system.

KONISHI KU928C-X is a professional raised access floor pedestal adhesive imported directly from Japan, offering the following outstanding performance characteristics:
- 🔹 High Bonding Strength: Creates a high-strength bond interface between the metal base and concrete substrate, effectively preventing displacement or loosening over long-term use;
- 🔹 Fast Curing: Reaches initial strength shortly after application, allowing subsequent panel installation to proceed continuously without delay;
- 🔹 Durability & Aging Resistance: Long-term application verified; bonding performance remains stable and reliable, largely unaffected by temperature or humidity changes;
- 🔹 Eco-Friendly & Low VOC: Meets indoor decoration environmental requirements, suitable for spaces sensitive to air quality such as office environments.
4. Final Installation Result
After 9 days of efficient and professional construction, the 725 m² GRC800 raised access floor installation project was successfully completed on April 15, 2026. The floor panels are neatly arranged with uniform joints, clearly visible pedestal nodes, and excellent overall flatness, fully meeting TEL’s rigorous acceptance standards.

Project Summary
The successful delivery of the 725 m² raised access floor project at TEL’s Beijing Runsheng Building once again validates the superior quality and reliable performance of the HUIYA GRC800 product in high-end Japanese-invested client projects. From factory production and quality inspection to on-site installation, from material standards certification to the selection of matching adhesives, every stage strictly adheres to Japanese export standards, ensuring zero compromise on delivery quality.
This project is yet another successful case in the ongoing cooperation between Huiya and Tokyo Electron (TEL) in China. From JIS certification credentials → export-grade quality control → precision installation → matching original accessories (KONISHI adhesive), Huiya has once again earned the recognition of this global semiconductor equipment giant through its full-chain, systematic service.
As a long-term raised access floor partner of Tokyo Electron in China, Changzhou Huiya Decoration Materials Co., Ltd. will continue to uphold its product philosophy of “Japanese Export-Grade Quality”, providing professional, efficient, and trustworthy raised access floor products and installation services to more high-end clients in the semiconductor, high-tech, financial, and other industries.
📞 Hotline / WhatsAPP: +86 18706128688
🌐 Official Website: www.huiyainc.com
Huiya Real-Time News
Huiya Real-Time News is dedicated to providing you with the latest and most authoritative information on the raised flooring industry.
We provide 24/7 updates on industry policy interpretations, market trend analysis, company news.
匯亜(HUYA)2026年東京視察で二重床の発展史を学ぶ旅 – UR まちとくらしのミュージアム見学記
5S・TPS・JITによる匯亜工場の高度なアクセスフロア製造
Global Data Center Trends 2026
MORE DOWNLOADS
GENERAL CATALOGUE
HUIYA INTRODUCTION
HUIYA GREEN LABEL

CAD/BIM FULL STEEL
APPLICATION SCENARIOS