Build an Increased Timber Floor
This plan thinks the new elevated floor will certainly be open to the reduced part of the room on one side, as it truly wouldn’t make sense to do it in a closed area with just an entrance leading in. It additionally assumes the room has actually been removed of all floor coverings, trim and also various other obstructions, and that the flooring you’re improving top of is level.

POINTS YOU WILL REQUIRE
Sufficient 2 x 8 boards to border all 4 sides of the space, plus enough extra 2 x 8s for joists every 16 inches of the length of the area. (Note: The boards for the joists require to be a minimum of as long as the width of the room.).
Sufficient 3/4-inch tongue-and-groove plywood to cover the area.
Tape measure.
Pencil.
Digital stud finder.
Masking tape.
Screw gun.
Miter saw.
Box of 3-inch wood screws.
Box of 1-1/2- inch wood screws.
Woodworker’s adhesive.
Square.
Walk around the area with your stud finder as well as your roll of concealing tape. Place a strip of tape on the wall to note each stud.



Huiya Real-Time News
Huiya Real-Time News is dedicated to providing you with the latest and most authoritative information on the raised flooring industry.
We provide 24/7 updates on industry policy interpretations, market trend analysis, company news.
匯亜、新たに塩霧試験装置を導入 OAフロアの品質防線を強化
회아, 새 염무시험장비 도입해 이중바닥재 품질 방호선 단단히 만듦
창주 회아 이중바닥재 회사, 한국 KSA 인증 획득하며 이중바닥재 공식 한국 수출 시작
常州汇亜OAフロア社、韓国KSA認証取得、OAフロアが正式に韓国に輸出サブタイトル
MORE DOWNLOADS
GENERAL CATALOGUE
HUIYA INTRODUCTION
HUIYA GREEN LABEL

CAD/BIM FULL STEEL
APPLICATION SCENARIOS