New Support System Ensures Superior Sound Insulation; Japan Konishi KU928 Adhesive Offers Exceptional Bonding
On July 20, 2025, the Applied Materials Wuhan office renovation project commenced installation of 732m² steel-encased raised access floor, which concluded successfully recently. This project utilized Best ECS600 series steel-encased , combined with a patented new support system and Japan Konishi KU928 support adhesive. Therefore, on-site client feedback confirmed zero abnormal noise from the raised access floor; furthermore, the compatibility between supports and proved highly effective. Consequently, this establishes a benchmark for systems in modern office spaces.

1,New Support System Successfully Resolves Secondary Installation Challenges for Raised Access Floor
Best ECS600 series raised access floor’s patented support system structurally addresses traditional installation difficulties. Technical documents indicate this system includes base supports and vertical components. The positioning plate features tapered thickness design—thicker near the base and thinner outward. Thus, during secondary installation, panels smoothly slide along guide plates into precise positions between adjacent plates, thereby reducing manual adjustments. Moreover, this enables tighter panel alignment.
Huiya installers report that this design simplifies secondary installation because the thicker plate sections provide stable support. Additionally, friction between metal supports and decreases, while reinforced plates further enhance load-bearing capacity. Support components include height-adjustable telescopic rods and sleeves. Thread-based adjustment adapts to varied heights, and after locking with nuts, slippage under heavy loads is prevented. Hence, stability significantly improves.
Notably, this support system offers shock absorption and sound insulation. Structural optimization reduces vibration-induced noise from raised access floor, which is the key reason for zero on-site noise reports.


2, Konishi Adhesive Enhances System Stability of Raised Access Floor
The Japan Konishi KU928 raised access floor support adhesive provides additional stability for the system. As a critical installation material, this adhesive offers high viscosity and anti-slip properties, thereby reducing friction noise between metal panels and supports.
Huiya installation teams explain that after curing, the adhesive forms an elastic buffer layer. When combined with support plates, it suppresses vibration transfer and tightens seams between panels. On-site inspections confirm no loosening of adhesive-secured panels, while overall sealing performance improves substantially. Thus, long-term operational stability of the raised access floor system is ensured.


3, Client Feedback Verifies Silent Performance of Raised Access Floor
After project completion, Wuhan Applied New Materials Company affirmed the installation results. Huiya received praise because the new system operates silently. Moreover, secondary installation saved significant time due to smooth worker operations. This experience stems from precise support guides and adhesive buffering—raised access floor panels align evenly without gaps, eliminating post-installation shifting issues common in traditional systems.
On-site tests demonstrate zero abnormal noise during daily use of the system. Therefore, its stability fully meets high-frequency demands in office environments.


4, Enterprise Selection Logic for Raised Access Floor Technology
As Applied Materials’ China R&D center, Wuhan Applied New Materials Company requires extreme environmental stability for semiconductor research. Minor vibrations or noise impact instrument precision. Consequently, Best system was selected specifically because its support system absorbs shocks, insulates sound, and ensures perfect support-panel compatibility—thus providing a stable foundation for R&D.
With the 732m² raised access floor project now completed, not only has office environment quality improved at Wuhan Applied New Materials Company, but Huiya’s new raised access floor technology has also gained real-world validation. Therefore, this project offers reference standards for industry peer selections.
