2,000㎡ HUIYA CSL1000 Calcium Sulphate Anti-Static Raised Access Floor Applied to Taicang Data Center – Delivering Stable Support for High-Reliability Operations, Electrostatic Protection, and Ongoing Maintenance
Project Overview
- Project Name: Jiangsu Suzhou Taicang Chayora Data Center Phase III
- Project Address: No. 5, Jiangjiabang Road, Huangjing Town, Taicang, Suzhou
- Installation Date: January 15, 2025
- Installation Area: 2,000 ㎡
- Product Used: HUIYA CSL1000 Calcium Sulphate Laminate Raised Access Floor

Project Partner | Focused on Yangtze River Delta Computing Node Infrastructure
The Suzhou Chayora Taicang Greater Shanghai Data Center project, specifically the Phase III implementation, is located at No. 5, Jiangjiabang Road, Huangjing Town, Taicang, Suzhou. Installation was completed on January 15, 2025, covering approximately 2,000 square meters of data center floor space using the HUIYA CSL1000 Calcium Sulphate Anti-Static Raised Access Floor.
Taicang Chayora Shanghai Data Center Campus · International-Grade Green Computing Hub in the Yangtze River Delta
The Taicang Chayora Shanghai Data Center Campus (also known as the Zhongli Cloud Data Center) is an international Class-A green computing base developed by Hong Kong’s Chayora Group in Taicang, Jiangsu. Strategically positioned within the core near-Shanghai zone of the Yangtze River Delta – in the Huangjing Town Industrial Park, Taicang, Suzhou (No. 7, Jiangjiabang Road) – the campus sits approximately 80 kilometers from the Pudong Central Business District in Shanghai. This proximity allows it to effectively absorb overflow computing demand from Shanghai, offering high-reliability data center services to the Shanghai and East China markets.

The project represents a total investment of approximately USD 200 million, covering 50 mu of land with a total gross floor area of 86,000 square meters. The campus is planned to include three data center buildings capable of housing 10,000 server racks and supporting 48MW of IT load capacity. Power infrastructure includes 120MVA/60MVA independent dual-feed supply with a dedicated substation to ensure power redundancy. The facility is designed to international Class-A and Uptime Tier III standards, with a PUE value below 1.25 – well ahead of China’s national energy efficiency requirements for large-scale data centers. The network layer supports ultra-high-speed direct connectivity to central Shanghai with carrier-neutral, multi-line redundant access.
Construction on the Chayora Taicang Data Center commenced in January 2022. The first data center building was topped out by the end of September the same year, formally completed on November 8, and entered phased operation from Q1 2023. The project is a cornerstone initiative within the Taicang Huangjing Green Digital Economy Industrial Park, forming a cluster effect alongside projects such as 21Vianet. Through its low PUE and scalable computing capacity, the campus actively advances the digital infrastructure of the Yangtze River Delta Integration strategy, while simultaneously driving the growth of local digital economy support industries.
Phase III Tenant · Leading E-Commerce Platform PDD
The tenant for the data center space in the Phase III project is Pinduoduo, one of China’s most prominent e-commerce platforms. Founded in 2015 and headquartered in Shanghai, Pinduoduo was listed on the Nasdaq Stock Exchange in 2018. Through its social group-buying model and C2M (Customer-to-Manufacturer) reverse customization approach, the platform rapidly won over a vast consumer base with high-value-for-money merchandise. As of 2024, Pinduoduo’s annual active buyers surpassed 1 billion, placing it among the top platforms in China by user scale.
Pinduoduo’s business portfolio spans domestic e-commerce, community group-buying, and the global cross-border platform Temu. The domestic platform centers on high-value products and its “10 Billion Subsidy” program, while Temu has expanded to cover more than 90 countries and regions globally, making it one of the fastest-growing cross-border e-commerce platforms in the world. Revenue is primarily derived from advertising, transaction commissions, and cross-border service fees, with net profit exceeding RMB 110 billion in 2024. The platform continues to evolve toward a branded, globally integrated e-commerce operation with a deepening focus on supply chain development, quality control, and after-sales service.
As a large-scale internet enterprise, Pinduoduo holds strict requirements for data center computing performance, network latency, and service reliability. Its data center footprint is concentrated in the Yangtze River Delta. The Chayora Taicang facility, with its near-Shanghai location and high-standard construction, serves as a critical computing hub supporting Pinduoduo’s high-reliability, low-latency operational requirements.
Project Requirements and Challenges · Stringent Demands Placed on the Floor System by a Data Center Environment
As an international Class-A data center serving large internet enterprises like Pinduoduo, the Phase III data center imposed technical requirements on the floor system that far exceeded those of ordinary construction projects. The high-density IT equipment operating 24/7 within the facility, the complex integrated cabling layout, and the frequent maintenance needs all demanded that the floor system simultaneously meet rigorous standards across multiple dimensions, including electrostatic protection, load capacity, ventilation and cooling, and operational maintainability.
?① Electrostatic Protection and Grounding for High-Density IT Equipment
The data center houses a large number of precision electronic devices, including servers, switches, and storage units, deployed at high rack density with significant asset value. Electrostatic discharge (ESD) can cause chip damage, data loss, or equipment failure. The floor must therefore deliver reliable and continuously stable anti-static performance, with surface resistance strictly controlled within the 10⁶ to 10⁹ Ω range. The entire floor system must also maintain effective grounding continuity, channeling static electricity safely into the ground to provide a protective barrier for all precision equipment.
?② High Load Capacity to Support Server Racks and Heavy Equipment
A fully loaded server rack in a data center can exceed one metric ton, and the concentrated placement of UPS systems, precision air conditioning units, and other heavy ancillary equipment places demanding requirements on both the point load and uniformly distributed load capacity of the floor system. The raised access floor must maintain structural integrity and planar stability under the combined effects of sustained static loads and frequent dynamic loads, with no sagging, deformation, or noise.
?③ Precision Underfloor Air Distribution and Cooling
Data centers typically employ an “underfloor supply, overhead return” airflow management approach, in which the plenum space beneath the raised floor serves as the static pressure chamber for the precision air conditioning system. This requires the floor system to support adjustable raised heights sufficient for airflow distribution, while the sealing characteristics of the floor panels and the placement of air grilles must be precisely coordinated to ensure cold air is evenly delivered to the front of every rack row, maintaining a stable temperature and humidity environment throughout the facility.
?④ Comprehensive Cable Routing and Management for High-Density Wiring
The data center involves the integrated routing of high-speed fiber optic cables, high-power electrical cables, monitoring signal cables, and other conduits at densities far exceeding those found in ordinary office environments. The raised access floor system must provide ample, well-organized cable routing space for all these runs, while enabling maintenance personnel to quickly locate, adjust, add, or remove cables without disrupting normal equipment operations.
?⑤ Reliable Panel Restoration Following Frequent Maintenance Access
Electrical, network, HVAC, and other maintenance activities take place with high frequency in a live data center environment. Each maintenance event typically requires the removal of several floor panels to access the underfloor plenum. During repeated panel removal and reinstatement, the support pedestal system is vulnerable to displacement or rotation from incidental contact. Once pedestals shift out of position, panels become difficult to reseat precisely, in minor cases causing uneven panel gaps or slight surface undulation, and in serious cases requiring large-scale re-leveling of the entire pedestal grid. This represents a critical challenge that data center floor installations must resolve.
?⑥ Class-A Fire Rating and Green Environmental Requirements
As a critical infrastructure facility carrying enormous data assets, the data center demands strict fire safety compliance. All construction materials within the facility must meet Class-A non-combustible or high fire-resistance standards. In addition, as a fully sealed operational environment with enclosed air circulation, any formaldehyde or harmful volatile emissions will directly affect the long-term safety of equipment and the health of maintenance personnel. The environmental performance of the floor system and all ancillary materials must therefore meet rigorous standards.
Based on the above six professional requirements, and after careful product comparison and technical solution demonstration, this project finally selected Huiya CSL1000 calcium sulfate antistatic raised floor as the core floor system, and paired it with Japanese Konishi KU928 F4 star bracket professional adhesive as auxiliary material, providing a comprehensive, reliable and environmentally friendly raised floor solution for the third phase of the Chaoyang Asia-Pacific Warehouse Data Center.
Professional Data Center Floor Solution · HUIYA CSL1000 Calcium Sulphate Anti-Static Raised Access Floor
Following a comprehensive comparison across multiple brands and product types, the project selected the HUIYA CSL1000 Calcium Sulphate Anti-Static Raised Access Floor as the floor system solution for the Phase III data center, covering an installation area of 2,000 square meters across all functional zones. The CSL1000 addresses each of the six stringent requirements through its high-density calcium sulphate core’s exceptional load performance, precisely controlled and stable anti-static specifications, and Class-A non-combustible fire rating.

The HUIYA CSL1000 belongs to the HUIYA CSL 1000–1500 Series high-density calcium sulphate raised access floor product line, a high-performance system developed specifically for electrostatic-sensitive environments such as cloud computing data centers and telecommunications rooms. The product uses high-strength calcium sulphate (gypsum) as the core material, with a core density of 1,600 kg/m³, combined with anti-static HPL (high-pressure laminate) or PVC conductive surface finish, conductive edge banding, and a support system to ensure outstanding electrostatic dissipation. Surface resistance is stably controlled within the 10⁶ to 10⁹ Ω range, effectively protecting precision electronic equipment in the data center from electrostatic damage.
HUIYA CSL1000 Technical Specifications
- ◆ Panel Dimensions: 600 × 600 mm | Panel Thickness: 32 mm
- ◆ Core Material: High-density calcium sulphate substrate (density 1,600 kg/m³)
- ◆ Base Panel Protection: Galvanized steel sheet (0.3 mm thickness) + anti-rust paint coating
- ◆ Surface Finish: HPL high-pressure laminate / ESD conductive vinyl tile / rubber tile
- ◆ Concentrated Load: 4.5 kN | Uniformly Distributed Load: 18.0 kN/m²
- ◆ Panel Weight: Approximately 18.5 kg per panel
- ◆ Dimensional Tolerance: ±0.25 mm | Flatness Tolerance: ±0.5 mm
- ◆ Surface Resistance: 10⁶ to 10⁹ Ω
- ◆ Pedestal System: Steel pedestals + stringers + screws; adjustable height from 55 mm to 2,000 mm
How the HUIYA CSL1000 System Addresses Each of the Six Data Center Requirements
Addressing Requirement ①: ✅ Precise Anti-Static Protection, Safeguarding Equipment Safety
Surface resistance is stably maintained within 10⁶ to 10⁹ Ω. Combined with conductive edge banding and a professional grounding system, the product forms a complete electrostatic discharge path from panel surface to ground, effectively eliminating static accumulation and protecting all precision IT equipment throughout the facility.
Addressing Requirement ②: ✅ High-Density Core Material, Superior Load Capacity
The 1,600 kg/m³ high-density calcium sulphate core, with a concentrated load rating of 4.5 kN and uniformly distributed load of 18.0 kN/m², comfortably sustains the long-term pressure of fully loaded server racks and heavy equipment while maintaining a flat, deformation-free surface.
Addressing Requirement ③: ✅ Flexible Raised Height, Ideal Underfloor Air Flow
The pedestal system supports height adjustment from 55 mm to 2,000 mm, providing an ideal static pressure plenum for the data center’s “underfloor supply, overhead return” air conditioning system, ensuring uniform and stable temperature and humidity throughout the space.
Addressing Requirement ④: ✅ Organized Cable Routing, Efficient Cable Management
The underfloor plenum provides ample dedicated routing space for the full range of fiber optic, power, and signal cables. Panels can be conveniently opened via screws for maintenance access, accommodating the flexible cable addition and removal requirements of a live data center environment.
Addressing Requirement ⑤: ✅ Paired with KONISHI KU928, Maintenance Restoration Made Effortless
Japan KONISHI KU928 pedestal adhesive securely bonds every pedestal base to the subfloor. Even after repeated panel removal for maintenance, the pedestal system remains firmly in position, allowing floor panels to be precisely and accurately restored each time – as detailed in the ancillary materials section below.
Addressing Requirement ⑥: ✅ Class-A Fire Rating, Green and Environmentally Safe
The calcium sulphate core is an inorganic, non-combustible material that meets the Class-A non-combustible fire rating standard. It contains no asbestos and no formaldehyde. Combined with F4-Star environmentally certified adhesive, the solution ensures the health and safety of the data center environment from the material source.
Regarding the pedestal system, HUIYA raised access floors employ a robust structure combining steel pedestals, stringers, and screws. Each pedestal incorporates a built-in flame-retardant acoustic isolation pad, effectively reducing friction noise between metal pedestals and metal floor panels. Pedestal bases are fitted with HUIYA environmentally friendly rubber pad accessories, manufactured from recyclable materials. The entire system ensures that the underfloor space can be efficiently organized for cable routing and ventilation engineering, providing a dedicated solution for the cable management and airflow requirements of the data center.
Wide Range of Surface Finishes · Eight Color Options to Meet Diverse Data Center Design Needs
The HUIYA CSL1000 Series calcium sulphate anti-static raised access floor is available in up to eight surface finish options, fully accommodating the diverse design styles and visual requirements of different environments, including data centers and office spaces. Whether the project calls for a minimalist, technology-inspired aesthetic or a warm, understated commercial ambiance, clients can select and combine finishes flexibly to suit the project’s positioning and design brief, achieving a harmonious balance between function and appearance.

For this Taicang Chayora Data Center Phase III project, a finish appropriate to the professional environment of the data center was selected according to the facility’s spatial design requirements, ensuring that the floor system delivers outstanding anti-static performance while presenting a clean, professional visual character throughout the space.
Reliable and Eco-Friendly Ancillary Materials · Japan KONISHI KU928 Pedestal Adhesive from a Century-Old Listed Enterprise
The entire raised access floor pedestal installation for this project utilized Japan KONISHI KU928 Pedestal Professional Adhesive, providing a solid foundation for the stability and long-term reliability of the 2,000-square-meter floor system.
About Japan KONISHI – A Bonding Expert Spanning Three Centuries
KONISHI Co., Ltd. was founded in 1870 (Meiji Year 3) and has a history of more than 155 years, making it one of Japan’s most established and leading specialty adhesive manufacturers. KONISHI was listed on the Osaka Stock Exchange in 1925 and currently trades on the Tokyo Stock Exchange (stock code: 4956), a true century-old listed company. Headquartered in Osaka, Japan, its “BOND” brand is widely recognized across Japan and Asia, with deep research and development expertise in construction adhesives and industrial bonding materials.
? Learn More About KONISHI
KU928 Raised Floor Pedestal Adhesive – F★★★★ Environmental Standard
| Features | Description |
|---|---|
| F★★★★ (F4-Star) Certification | Meets Japan JIS standard for high environmental grade, with formaldehyde emissions approaching zero |
| Formaldehyde-Free | Product formula contains no formaldehyde, eliminating formaldehyde pollution at the source |
| Free of 13 Harmful Substances | Contains no toluene, xylene, or 13 other harmful volatile organic compounds (VOCs) |
| Super Strong Adhesion | Specifically designed for raised floor pedestals, providing durable and stable bonding performance |
| Excellent Weather Resistance | Resistant to high temperatures, low temperatures, and humidity, adaptable to various indoor environmental conditions |
| Good Workability | Easy to apply, with a reasonable curing time, suitable for large-area, high-efficiency installation |
F★★★★ (F4-Star) is the highest-grade certification under Japan’s JIS industrial standards for formaldehyde emissions from interior building and finishing materials, representing a formaldehyde emission level of ≤0.3 mg/L – one of the most stringent indoor environmental standards currently recognized internationally. In the fully sealed, continuously operating environment of a data center, specifying KU928 adhesive effectively eliminates indoor air quality risks at the level of ancillary materials.


?Why Do Data Center Machine Rooms Require KONISHI KU928 Pedestal Adhesive?
The specialized operational demands of high-density equipment in a data center mean that ongoing cross-trade maintenance activities will take place continuously throughout the facility’s service life – encompassing network cabling adjustments, high-voltage electrical modifications, precision air conditioning refrigerant circuit servicing, UPS system maintenance, fire suppression system inspections, and more.
Each maintenance event typically requires the removal of a number of floor panels to temporarily open floor access and work within the underfloor plenum. Under conventional installation methods where pedestals are not adhesively fixed, once panels are removed, the steel support bases, no longer held in compression by panel weight, are prone to displacement or rotation as personnel move through the underfloor space.
Once a pedestal shifts out of position, the consequences are frustrating: panels cannot be accurately returned to their original positions, resulting at best in uneven panel gaps or slight surface irregularity, and at worst requiring large-scale re-leveling of the entire support grid. This is not only time-consuming and labor-intensive, but during emergency repair scenarios can delay service restoration and compromise the continuous operation of the facility.
⚠️ Pain Points in Data Center Maintenance: After multiple maintenance checks, accumulated misalignment in the raised floor support system of a data center not only complicates floor restoration but can also cause minor vibrations or noises due to uneven surfaces, affecting the quiet operating environment of the data center and potentially interfering with the precision equipment beneath the server racks.
To address these pain points, after all floor installation and leveling were completed, the project team deployed workers to the raised floor to apply Xiaoxi KU928 bracket-specific adhesive to all fixing screw holes and contact surfaces of the support bases. After application, the adhesive was allowed to cure at room temperature for 24 hours, ensuring a stable bond between the support bases and the floor substrate, thus locking the entire support system in precise position.


✅ Practical Application Results: After the comprehensive application of Xiaoxi KU928 bracket adhesive in the Taicang Chaoya Phase III project, the entire 2000-square-meter server room floor support base system was securely locked in place. The on-site construction team reported that the KU928 adhesive was smooth to apply, easy to use, and cured evenly and stably, with excellent bonding performance verified on-site. During subsequent maintenance by various trades in the server room, the bracket positions remained stable after panel removal, and the floor restoration work was smooth and efficient. This effectively reduced the disturbance to the overall stability of the floor system caused by multiple maintenance operations, significantly improving the maintainability and ease of operation of the server room.
? Process Highlights: After the floor installation was completed, the construction team specifically arranged for workers to enter the raised floor and meticulously apply adhesive to each support base hole. This demonstrates the project’s high attention to detail in engineering quality and is a concrete manifestation of Huiya Flooring’s adherence to professional construction standards in data center projects. It is worthy of promotion and application in similar server room projects.
Konishi KU928 bracket adhesive meets the F4 star (F☆☆☆☆) environmental certification standard—the strictest level for formaldehyde emission control in the Japanese JIS building materials standard system. This indicates extremely low formaldehyde emissions, and the product has passed limit tests for 13 harmful substances, meeting the safety requirements for building materials used in enclosed indoor environments. Data centers are long-term closed indoor environments; using F4 star certified construction materials helps maintain air quality and ensures the health and safety of equipment and maintenance personnel.
? Thumbs up for Konishi KU928 bracket professional adhesive!
Precision Installation · Complete Professional Installation Record of the 2,000㎡ Raised Access Floor
HUIYA’s raised access floor installation approach is clear and systematic on the job site. Floor panels are fastened via screws, and the pedestal system supports flexible height adjustment, ensuring the creation of an effective plenum space between the floor system and the subfloor, providing a dedicated solution for data center cable routing and ventilation planning. The 2,000-square-meter installation was completed to a high standard by a specialist installation team, with rigorous quality control applied at every stage to deliver a final floor surface that is flat, stable, and consistent.



2. Floor Panel Laying (including detailed underfloor pedestal work with KONISHI adhesive fixation)



4. Panoramic View of the Raised Floor Installation in Chayora Data Center
Project Value · Five Core Highlights Setting the Leading Supplier for Data Center Flooring
✅ 2,000㎡ Integrated Anti-Static Floor System, Protecting Computing Assets
Two thousand square meters of HUIYA CSL1000 calcium sulphate anti-static raised access floor provides full coverage across the Phase III data center. With surface resistance precisely controlled in the 10⁶ to 10⁹ Ω range and paired with a comprehensive grounding system, the floor establishes a reliable electrostatic protection framework for the high-density IT equipment in Pinduoduo’s data center.
✅ High-Density Calcium Sulphate Core, Robust and Stable Load Performance
With a core density of 1,600 kg/m³, a concentrated load rating of 4.5 kN, and a uniformly distributed load capacity of 18.0 kN/m², the floor system confidently sustains the long-term concentrated weight of fully loaded server racks and heavy equipment, ensuring that the floor of this international Class-A data center remains consistently flat and solid.
✅ KONISHI KU928 Pedestal Adhesive, Solving an Industry-Wide Maintenance Restoration Pain Point
Japan KONISHI KU928 F4-Star professional adhesive firmly bonds every pedestal to the subfloor, fundamentally resolving the industry-wide challenge of pedestal displacement and difficult panel restoration caused by frequent maintenance access, significantly improving operational efficiency throughout the full service life of the facility.
✅ All-Eco-Friendly Material System, Aligned with Green Data Center Principles
From the HUIYA CSL1000’s asbestos-free, formaldehyde-free, Class-A non-combustible raised access floor, to the Japan KONISHI KU928 F4-Star formaldehyde-free, harmful-substance-free professional adhesive, the project builds a comprehensive environmental material system from the source, fully aligned with Chayora’s low-carbon green computing base operating philosophy.
✅ Quality Endorsement from an International Class-A Data Center
The Chayora Taicang Data Center, designed to Uptime Tier III international Class-A standards, applies stringent selection criteria to all building materials. HUIYA CSL1000 successfully delivered the full 2,000-square-meter installation through consistent product quality and professional execution capability, clearly demonstrating HUIYA’s performance credentials in high-standard data center projects.
HUIYA · Your Trusted Data Center Raised Access Floor System Solutions Provider
The successful completion of the Suzhou Chayora Taicang Greater Shanghai Data Center Phase III project represents another landmark case study for the HUIYA CSL1000 Calcium Sulphate Anti-Static Raised Access Floor in the international Class-A data center sector. The 2,000-square-meter precision installation not only thoroughly validates the CSL1000’s outstanding performance across high load capacity, precise anti-static control, Class-A fire rating, and environmental sustainability, it also demonstrates HUIYA’s professional service capability to deliver comprehensive solutions on high-standard data center projects.
From a Japanese century-old listed enterprise’s F4-Star environmentally certified adhesive, to a high-performance calcium sulphate raised access floor made in China, to a pedestal fixation solution purpose-engineered for the frequent maintenance demands of data centers — this project brings together the finest resources and professional expertise of both China and Japan, jointly delivering to Pinduoduo’s data machine room a raised access floor system of outstanding performance, convenient maintainability, and environmental responsibility, supporting the high-quality operation of a core computing hub at the heart of the Yangtze River Delta.
| Item | Details |
|---|---|
| Project Name | Suzhou Taicang Chayora Data Center Phase III |
| Project Address | No. 5, Jiangjiabang Road, Huangjing Town, Taicang, Suzhou |
| Installation Area | 2,000 m² |
| Installation Date | January 15, 2025 |
| Floor Product | HUIYA CSL1000 Calcium Sulphate Anti-Static Raised Access Floor |
| Ancillary Adhesive | Japan KONISHI KU928 Pedestal Professional Adhesive (F4-Star Standard) |
| Data Center Tenant | Pinduoduo (PDD Holdings) |
| Data Center Operator | Chayora (Hong Kong) |
Changzhou Huiya Decorative Materials Co., Ltd (HUIYA) is a professional provider of raised access floor system solutions in China, specializing in the R&D, manufacturing, and sales of premium raised access floor products, including the CSL Series Calcium Sulphate Raised Access Floor, SC Series Steel-Cement Raised Access Floor, and GRC Inorganic Cement Raised Access Floor. Products are widely applied in international data centers, Fortune 500 corporate headquarters, premium commercial office buildings, semiconductor factories, AI industrial parks, and other high-standard projects.
If your project has raised access floor requirements, we welcome you to contact HUIYA. We will provide professional product selection advice and customized solutions tailored to your needs.
? Enquiry Hotline / WhatsAPP: +86 18706128688
? Official International Website: www.huiyainc.com
Huiya Real-Time News
Huiya Real-Time News is dedicated to providing you with the latest and most authoritative information on the raised flooring industry.
We provide 24/7 updates on industry policy interpretations, market trend analysis, company news.
匯亜OAフロア、日本・福伸電機を訪問 -リーン生産方式と企業経営のノウハウを深く学ぶ
湖州にて日本式二重床システムの現地調査:商業用フリーアクセスフロアから住宅市場への新たな機会 | 汇亚
HUIYA社、JIS A 1450試験装置を完成させ、日本のOAフロア市場向け日本規格への適合を実現
MORE DOWNLOADS
GENERAL CATALOGUE
HUIYA INTRODUCTION
HUIYA GREEN LABEL

CAD/BIM FULL STEEL
APPLICATION SCENARIOS